Dockside Projects
Dockside Project: MV Incetrans Photo Gallery

Hugo Neu-Proler

Scope: Repair cargo damage to double bottom tank top in cargo hold.
• Cut out and remove damaged plate and internal longitudinal and transverse stiffeners
• Prepare new stiffener plates, tank top plate insert, and prepare all surfaces for welding
• Fit new structural members and accomplished production welding
• Ultrasonic test (shear wave inspection) of repair weld (angle beam 100%
weld)



 

 
Lifeboat Inspection FAQ Contact Us About Us Insulation Fabrication Machining Ship M&R